OGU Oil & Gas Uzbekistan 2026

Valero Energy Diesel Hydrotreater

Valero Energy selected CB&I to design and build a 16,000 barrel per stream day (BPSD) UOP ultra low sulfur diesel hydrotreater at its refinery in Benicia, California.  CB&I provided the engineering, procurement and construction for the project plus related ancillary equipment and systems. A very tight plot space at the refinery was a challenge that was faced and overcome by CB&I’s field crew.

SUBSCRIBE OUR NEWSLETTER

WHITE PAPERS

Surplus Tubular Supply Accelerates First Oil Delivery

Reducing the time between discovery and production is a primary goal for upstream operators. Leveraging surplus tubular supply offers a strategic advantage by cutting procurement lead times, allowing for a more rapid deployment of drilling assets and a significantly faster path to first oil.

RELATED ARTICLES